Skip to main content

IMIS - Marine Onderzoeksgroepen

[ report an error in this record ]basket (0): add | show Print this page

Initial Data Management Plan. Deliverable – D1.3 under the WP1 of the BLUE CONNECT project (GA n° 1011656759)
Whatley, L.; Kvanneid, A.J. (2024). Initial Data Management Plan. Deliverable – D1.3 under the WP1 of the BLUE CONNECT project (GA n° 1011656759). Blue Connect: [s.l.]. 24 pp.

Available in  Authors 
Document type: Project report

Project Top | Authors 
  • MPA Network for Ecosystem Connectivity and Co-Management towards Strict Protection and Restoration, more

Authors  Top 
  • Whatley, L., more
  • Kvanneid, A.J.

Abstract
    This document is the initial data management plan (DMP) of the BLUE CONNECT project. The DMP presents a summary of the data that will be collected, generated and (re)used in the project and explains the purposes of using this data. It also includes a definition of the data and outlines the steps necessary to maximise the FAIRness (Findability, Accessibility, Interoperability, and Reusability) of the project’s outputs. Issues concerning ethics and the General Data Protection Regulation (GDPR) are also addressed. Key data management issues are discussed, including common (meta)data standards and formats, the data flow to be followed throughout the project, data quality control, (meta)data vocabulary, publication policy, and data licensing. Therefore, the DMP provides data management guidelines for the partners to follow. It should be considered a living document; updates will be made throughout the project’s lifetime with more specific information on data collected, generated, and used in BLUE CONNECT. These updates will be used to write the Final DMP (D1.4) in month 42, which will also outline data management after the end of the project.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors